A turnkey solution integrating Formwork, Rebar, and Concrete to eliminate delays, control costs, and guarantee quality.
The traditional multi-subcontractor model is broken. It creates unavoidable friction, leading to delays and budget overruns.
Sequence dictates schedule. Any delay here impacts everyone.
Waits on formwork. Blamed for slow installation if forms are late.
Ready-mix trucks waiting. Incurs standby costs due to others' delays.
This constant conflict results in a 15-20% average schedule slip on the structural phase.
FRC3™ operates as a single, accountable team. Our cross-trained crews execute all three trades in a seamless, predictable flow.
Formwork
Rebar
Concrete
Done
Integrated Quality Checks (✓) at each handoff eliminate blame and ensure perfect execution.
FRC3's multi-skilled teams are significantly faster. (Data for Dallas, TX)
Eliminating coordination overhead and delays directly impacts the bottom line.
Our embedded TQM process uses rigorous checklists at every stage, ensuring the job is done right the first time.
Reduce structural frame duration by up to 20%.
One fixed price. Zero change orders from trade conflicts.
One team, one contract. We own the entire scope.
Your PMs manage one sub, not three, freeing them for critical tasks.